Transformer Maintenance (Door Locks)

Project Details

Transformer Door and Lock Repair at Fiume Santo Site, Italy

Client

Goodwe

Location

Fiume Santo, Italy

Date

14-07-2024

Overview:

This project entails the repair of transformer doors and locks at the Fiume Santo site in Italy. The transformers are critical assets for ensuring reliable energy transmission and require secure and functional access points. This initiative aims to enhance security, safety, and operational efficiency by restoring the integrity of the doors and locks on the transformer units.

Scope of Work:

–  Assessment of the existing transformer doors and locks to identify repair needs.

–  Repair and replacement of faulty or damaged doors and locks.

–  Ensuring all locks are fully functional and provide adequate security.

–  Repainting and maintenance to prevent corrosion and wear on the doors.

–  Compliance with safety regulations and quality standards throughout the repair process.

Objective: To ensure that all transformer doors and locks at the Fiume Santo site are secure, functional, and up to regulatory standards, providing enhanced protection for equipment and personnel.

Timeline: Project was completed within 1 week.

Deliverables:

–  Repaired and fully operational transformer doors and locks.

–  Final inspection report certifying compliance with safety standards.

  • Handover upon successful completion of all repairs.

GoodWe’s commitment to operational excellence ensured that the repairs carried out efficiently, ensuring long-term reliability and security at the Fiume Santo site.